In the world of vibration isolation technology, the proper setup of an isolation table is crucial for optimal performance. In this guide, we'll walk you through the step-by-step process of unboxing and assembling your vibration isolation table, ensuring you achieve the best results for your specific needs.
Unpackaging Your Isolation Table
Upon receiving your Bilz vibration isolation table, you'll find two skids. The first contains the table frame with pre-mounted air springs, while the second holds the granite top. Make sure to carefully follow the instructions provided and pay attention to the three metal plates included with the table frame.
Assembling Your Isolation Table
Tips for Success
- Epoxy Application:
Ensure a secure hold by applying a two-part epoxy to the bottom of the metal plates during installation.
- Air Supply Considerations:
Whether using the provided air compressor or your own shop air, guarantee a clean and dry air supply to maintain the table's efficiency.
- Pressure Adjustment:
Gradually adjust the pressure regulator to prevent damage to the air springs and achieve the desired lift for the granite top.
Setting up your vibration isolation table is a meticulous process that directly impacts its performance. Following these detailed instructions from Bilz USA ensures a smooth and effective setup.
For a visual walkthrough and additional tips, we recommend watching the full instructional video provided by Bilz USA. Invest the time in proper setup to enjoy the full benefits of your vibration isolation table in various applications.