Fraud Blocker

A Comprehensive Guide to Setting Up Your Vibration Isolation Table

In the world of vibration isolation technology, the proper setup of an isolation table is crucial for optimal performance. In this guide, we'll walk you through the step-by-step process of unboxing and assembling your vibration isolation table, ensuring you achieve the best results for your specific needs.

Unpackaging Your Isolation Table

Upon receiving your Bilz vibration isolation table, you'll find two skids. The first contains the table frame with pre-mounted air springs, while the second holds the granite top. Make sure to carefully follow the instructions provided and pay attention to the three metal plates included with the table frame.

Assembling Your Isolation Table

  1. 1. Table Frame Assembly:
  • Carefully remove the isolation table from the skid, using a forklift if necessary.
  • Place the granite top on the air springs, ensuring even gaps around the edges.
  • Utilize the adjustable feet on the table frame to level the granite.
  1. Metal Plate Installation:
  • Position three metal plates under the level control valves.
  • Apply epoxy to secure the plates in place.
  •  Adjust the knurled ring counterclockwise until pressure is felt, then back down slightly for a consistent starting point.
  1. Connecting to Air Supply:
  • Connect the supplied air compressor to the pressure regulator.
  • If using your own air supply, ensure it is clean and dry.
  • Adjust the pressure regulator to approximately six bars (87 PSI) to initiate the lifting of the granite.
  1. Final Leveling:
  • Check the gaps around the air springs to ensure uniformity.
  • Fine-tune the level using the control valves, focusing on one axis at a time.
  • Once satisfied, your isolation table setup is complete.

Tips for Success

- Epoxy Application:

Ensure a secure hold by applying a two-part epoxy to the bottom of the metal plates during installation.

- Air Supply Considerations:

Whether using the provided air compressor or your own shop air, guarantee a clean and dry air supply to maintain the table's efficiency.

- Pressure Adjustment:

Gradually adjust the pressure regulator to prevent damage to the air springs and achieve the desired lift for the granite top.

Setting up your vibration isolation table is a meticulous process that directly impacts its performance. Following these detailed instructions from Bilz USA ensures a smooth and effective setup.

For a visual walkthrough and additional tips, we recommend watching the full instructional video provided by Bilz USA. Invest the time in proper setup to enjoy the full benefits of your vibration isolation table in various applications.

This field is hidden when viewing the form
This field is hidden when viewing the form
This field is for validation purposes and should be left unchanged.